4800 three ply wire multi dryers duplex paper board making machine
Description
The duplex paper board making machine is specially designed to produce super quality cardboard paper of 90-200gsm. It produces 355tons cardboard paper per day. Forming section of this duplex paper board making machine use hydraulic headbox with dilute water. It has three wires, bottom wire is 27m, in-line wire is 11m and top wire is 8m.
Structure of the duplex paper board making machine
Forming section | Dilute water type hydraulic headbox |
Thress wires forming (17m+11m+8m) | |
Press section | Two vacuum pick up |
One vacuum press | |
Two big jumbo roll press | |
Dryer section |
36sets dryer cylinders (1+3/3U+10+10 sizing machine +1+11+calenderr) |
Reeling machine | Horizontal pneumatic reeling machine with roll wearhouse |
FAQ:
1. How to install and maintain the machine?
A: Firstly,we will provide the installation guild with the machine for your reference.
Secondly,our company is responsible for training production workers for you, ensuring that the workers will be independent operation.
2. How can we get the matching accessories or wearing parts conveniently?
A: During the warranty,Our company can replace the accessories for free .Out of warranty,we can provide them at the preferable price .In fact,the wearing parts are standard parts that you could get it in your country at your convenience.
3. Why would I choose your company?
A: Firstly,Our company has rich paper machine design and experience, and is the collection of paper making machinery research, design, manufacture, installation,commissioning and service, becoming one of the multi-functional enterprise.
Secondly,our company could provide the marvelous after-sale services,which is responsible for all installation and debugging, and training the production workers ,ensuring that the workers will be independent operation.
Thirdly,our company persist in the slogan “Customer’s satisfaction is our standing pursuit”.
Warm Tips:
1. Before installation,you should check that equipment’s model and dimension are all right with the parts completed and level remaining.
2. Before the debugging of installation,Checking each part is correct, lubrication supply normal. Water, electricity values reaching the standard.
3. During Operation,you should pay attention to keep daily inspection, cleaning and oiling.and then examine and repair regularly.