2600mm copy paper making machine single fourdrinier paper production equipment
Structure of this copy paper making machine
It is composed of fourdrinier section, press section, dryer section, base section, transmission section etc. The fourdrinier section of this copy paper making machien equips with an open type headbox. And wire length is 18m. Press section is combination of one four roll two press nips and one big main press. Dryer sections are 24sets dryer cylinders. The copy paper making machine adopts four roll soft calender.
Technical data of the copy paper making machine
Technical parameter is the design standards for each part of paper making machine and auxiliary equipment, which will strictly comply to below parameter:
Output: copy paper, carbonless paper |
Net paper width: 2600mm |
GSM: 40-80g/m2 |
Headbox lip width: 2900mm |
Design speed: 350m/min. |
Gauge: 3700mm |
FAQ:
1. How to install and maintain the machine?
A: Firstly,we will provide the installation guild with the machine for your reference.
Secondly,our company is responsible for training production workers for you, ensuring that the workers will be independent operation.
2. How can we get the matching accessories or wearing parts conveniently?
A: During the warranty,Our company can replace the accessories for free .Out of warranty,we can provide them at the preferable price .In fact,the wearing parts are standard parts that you could get it in your country at your convenience.
3. Why would I choose your company?
A: Firstly,Our company has rich paper machine design and experience, and is the collection of paper making machinery research, design, manufacture, installation,commissioning and service, becoming one of the multi-functional enterprise.
Secondly,our company could provide the marvelous after-sale services,which is responsible for all installation and debugging, and training the production workers ,ensuring that the workers will be independent operation.
Thirdly,our company persist in the slogan “Customer’s satisfaction is our standing pursuit”.
Warm Tips:
1. Before installation,you should check that equipment’s model and dimension are all right with the parts completed and level remaining.
2. Before the debugging of installation,Checking each part is correct, lubrication supply normal. Water, electricity values reaching the standard.
3. During Operation,you should pay attention to keep daily inspection, cleaning and oiling.and then examine and repair regularly.