Writing printing papermaking machine waste paper recycling machine
Description of dewatering elements in wire section
Item | Description |
High vacuum suction box |
4sets |
Water leg suction box |
2sets |
Three piece water scrapting plate | 6sets |
Five piece water scrapting plate | 2sets |
Forming plate | 1set (1+3 slabs) |
This writing printing papermaking machine according to the biggest grammage and pulp type equip dewatering element, can ensure the production capacity. When the paper grammage changes, can adjust the vacuum dewatering elements to change the vacuum degree, to ensure the paper dryness. According the vacuum degree from low to high, equipped forming plate, water scraping plate, water leg type suction box, low vacuum suction box, high vacuum suction box.
FAQ:
1. How to install and maintain the machine?
A: Firstly,we will provide the installation guild with the machine for your reference.
Secondly,our company is responsible for training production workers for you, ensuring that the workers will be independent operation.
2. How can we get the matching accessories or wearing parts conveniently?
A: During the warranty,Our company can replace the accessories for free .Out of warranty,we can provide them at the preferable price .In fact,the wearing parts are standard parts that you could get it in your country at your convenience.
3. Why would I choose your company?
A: Firstly,Our company has rich paper machine design and experience, and is the collection of paper making machinery research, design, manufacture, installation,commissioning and service, becoming one of the multi-functional enterprise.
Secondly,our company could provide the marvelous after-sale services,which is responsible for all installation and debugging, and training the production workers ,ensuring that the workers will be independent operation.
Thirdly,our company persist in the slogan “Customer’s satisfaction is our standing pursuit”.
Warm Tips:
1. Before installation,you should check that equipment’s model and dimension are all right with the parts completed and level remaining.
2. Before the debugging of installation,Checking each part is correct, lubrication supply normal. Water, electricity values reaching the standard.
3. During Operation,you should pay attention to keep daily inspection, cleaning and oiling.and then examine and repair regularly.