Twin wire paper making machine produce white carbonless copy paper
Vacuum couch roll of the twin wire paper making machine
Vacuum couch roll is an very important components in wire section of the twin wire paper making machine. It's max. vacuum suction width is 3950mm, mini suction width is 3600mm. Suction width is adjustable. Roll surface open holes of dia8mm/dia13mm and holes open rate is 48%. The vacuum roll cylinder is stainless steel of 30mm thick and the vacuum chamber is also stainless steel.
Material of vacuum couch roll
Roll cylinder | stainless steel |
Transmission side shaft |
ZG25 |
Operation side shaft |
HT250 |
Vacuum chamber |
stainless steel |
Bearing house | HT250 |
Cleaning spray pipe | stainless steel |
FAQ:
1. How to install and maintain the machine?
A: Firstly,we will provide the installation guild with the machine for your reference.
Secondly,our company is responsible for training production workers for you, ensuring that the workers will be independent operation.
2. How can we get the matching accessories or wearing parts conveniently?
A: During the warranty,Our company can replace the accessories for free .Out of warranty,we can provide them at the preferable price .In fact,the wearing parts are standard parts that you could get it in your country at your convenience.
3. Why would I choose your company?
A: Firstly,Our company has rich paper machine design and experience, and is the collection of paper making machinery research, design, manufacture, installation,commissioning and service, becoming one of the multi-functional enterprise.
Secondly,our company could provide the marvelous after-sale services,which is responsible for all installation and debugging, and training the production workers ,ensuring that the workers will be independent operation.
Thirdly,our company persist in the slogan “Customer’s satisfaction is our standing pursuit”.
Warm Tips:
1. Before installation,you should check that equipment’s model and dimension are all right with the parts completed and level remaining.
2. Before the debugging of installation,Checking each part is correct, lubrication supply normal. Water, electricity values reaching the standard.
3. During Operation,you should pay attention to keep daily inspection, cleaning and oiling.and then examine and repair regularly.